Feed Trough Construction

Show More

© 2020 Sedgewood Plantation.

Feeding Pads

The ends broke off due to the heavy tractor and feed wagon. This was remedied by pouring the ends 6 inches thick and using 4000 psi concrete. Also, the grade around the concrete should be built up with gravel to be higher than the concrete.